Where these stand (checked November 15, 2026)
Which rule binds you depends on the clauses written into your prime contract. Three sets of text are in play:
| Version | Clauses | Before a subcontract award | Status |
|---|---|---|---|
| DFARS as codified | Provision 252.204-7019 and clause 252.204-7020 (both NOV 2023) | 7020(g)(2): no award unless the sub has completed at least a Basic Assessment in the last 3 years | In the DFARS today (DFARS Change 05/07/2026; eCFR current to November 12, 2026) |
| DoD Class Deviation 2026-O0025 | No 7019. Clause 252.240-7997 (FEB 2026) in place of 7020 | No assessment condition in 7997; it still flows down | DoD contracting officers are told to use it in place of the codified text (Revision 3, September 3, 2026) |
| CMMC clause | 252.204-7021 (NOV 2025), with 32 CFR part 170 | 7021(f)(2): the sub has a current CMMC status at the level for the information flowed down | In both versions, where the contract names a CMMC level |
The class deviation is how DoD is carrying out the FAR Overhaul in the DFARS: it moves subpart 204.73 to a new section 240.370, and its memorandum says it stays in effect until rescinded or incorporated into the regulations. It hasn't been through rulemaking, so the codified DFARS still reads as it did.
What 252.204-7019 and 7020 say, as codified
- 252.204-7019 is a notice to offerors. To be considered for award, an offeror that is required to implement NIST SP 800-171 must have a current assessment, not more than 3 years old unless the solicitation sets a shorter time, for each covered contractor information system relevant to the offer, with its summary score posted in the Supplier Performance Risk System (SPRS). It is a solicitation provision, so it has no flow-down paragraph.
- 252.204-7020 is the contract clause. It applies to systems that must comply with NIST SP 800-171 under DFARS 252.204-7012, and has the contractor give the government access to its facilities, systems and people for a Medium or High assessment.
- Three kinds of assessment. A Basic Assessment is the contractor's own, from its system security plan, and gives a "Low" confidence score because it is self-generated. Medium and High Assessments are done by the government.
- What goes in SPRS. A summary score, not the value for each requirement. The clause's examples are scores "out of 110", with the date the assessment was completed, the CAGE codes the system security plan covers, and the date a score of 110 is expected.
- The contracting officer checks. Under DFARS 204.7303(b), before awarding to a contractor that must implement NIST SP 800-171, and before exercising an option or extending performance, the contracting officer verifies in SPRS that a current score is posted.
What a prime must confirm before awarding a subcontract
If your contract carries 252.204-7020. Paragraph (g) has two parts. First, put the substance of the clause in all subcontracts and other contractual instruments, commercial ones included, COTS excluded. Second, don't award a subcontract that is subject to NIST SP 800-171 under 252.204-7012 unless the subcontractor has completed, within the last 3 years, at least a Basic Assessment for all covered contractor information systems relevant to its offer that aren't part of an IT service or system operated on behalf of the government. A sub with no current score in SPRS may do a Basic Assessment and submit it.
If your contract carries 252.240-7997 instead. The deviation clause keeps the government's Medium and High Assessments and the flow-down of the clause's substance. It has no Basic Assessment and no condition on awarding a subcontract.
If your contract carries 252.204-7021. Before awarding a subcontract that will process, store or transmit FCI or CUI, make sure the sub has a current CMMC status at the level 32 CFR 170.23 sets: Level 1 (Self) for FCI only, Level 2 (Self) at least for CUI, and Level 2 (C3PAO) when the prime contract requires Level 2 (C3PAO) or Level 3. A Level 2 self-assessment is scored and entered in SPRS under 32 CFR 170.16, so a sub at Level 2 (Self) has a score there for a different reason. See the CMMC flow-down guide for where CMMC stands.
A contract awarded before the deviation may carry 7020 and a newer one 7997, with or without 7021, so a prime with several DoD contracts can be under more than one of these at once.
SPRS scores are not public: ask the supplier
A prime has no way to look up a subcontractor's score. That is by design:
- Under 252.204-7020(f), summary scores in SPRS are available to DoD personnel, and a contractor's authorized representatives may view their own company's scores
- The SPRS FAQ answers "What is the cyber score of my subcontractor?" with: "If the cyber score of a subcontractor is required, contact them directly. SPRS reports are not releasable under the Freedom of Information Act (FOIA)."
So the only evidence a prime can hold is what the sub gives it. Ask for it in writing, signed by someone who can speak for the company:
- The summary score, and the date the assessment was completed or posted
- Who did it: a self-assessment (Basic, or CMMC Level 2 Self), DCMA, or a C3PAO
- Which revision of NIST SP 800-171 it was done against
- The CAGE codes it covers, so you can see it covers the entity and site doing your work
- If the score is below 110, the date the sub expects to reach it
- For CMMC, the status, its date, the CMMC UID and the date of the latest affirmation
A score ages: 7019 and 7020 count an assessment as current for 3 years, and the clause that requires a Basic Assessment asks only that one was completed, not that the score reached any number. A CMMC Level 2 score works differently: under 32 CFR 170.24 each unmet requirement subtracts from the maximum, so a score can be negative, and under 32 CFR 170.21 a conditional status needs at least 80 percent of the maximum.
How Watch helps
- Watch's supplier portal asks each sub for its SPRS score and the date it was posted, with its CMMC level, assessment type, status date, CMMC UID and latest affirmation, in a signed "CUI handling and CMMC status" questionnaire. The sub needs no account
- The score is kept on the supplier as the sub's own attestation, with who signed it and when
- An "SPRS score" requirement holds suppliers to a minimum you set, and counts a score as unmet when it is missing or more than three years old
- The answers sit next to the sub's SAM.gov registration and exclusion status, which Watch does read from the public record every day, and come out in the per-supplier evidence package
Watch doesn't read SPRS, CMMC status or any other DoD system, and nobody outside DoD can for another company. It records what the supplier tells you. It doesn't verify the score, and its questionnaire names the codified clause numbers, so compare it with the clauses in your contract.