What the template covers
CUI where the prime contract requires Level 2 (Self): a NIST SP 800-171 self-assessment every three years, final or conditional (POA&M closed out within 180 days, score 88 or more), posted to SPRS, affirmed every year (32 CFR 170.16, 170.21, 170.22).
3 items, all answered by the supplier. Each is marked critical or warning, which is the severity of the finding an unmet item raises in Watch.
The checklist
1. CMMC Level 2 (Self) or higher
Critical · From the supplier- What counts
- A current CMMC status at Level 2 (Self) or higher: inside its validity, a conditional status inside its 180 days, affirmed in the last year.
- Why it is on the list
- Paragraph (f) of DFARS 252.204-7021 has the prime, before awarding a subcontract that will process, store or transmit FCI or CUI, make sure the sub has a current CMMC certificate or status at the level appropriate for the information flowed down to it. The template cites 32 CFR 170.16, 170.21, 170.22. Guide: CMMC flow-down to subcontractors (DFARS 252.204-7021).
- Where the answer comes from
- The supplier: an attestation through the portal, a document it sends, or a status you record yourself. Watch doesn't assess anyone.
2. SPRS score 88 or higher
Warning · From the supplier- What counts
- A NIST SP 800-171 score of 88 or higher, under three years old. 88 is the score the template gives for a conditional Level 2 status.
- Why it is on the list
- In practice, CMMC flow-down means holding each sub's SPRS score for NIST SP 800-171 with the date it was posted, next to its CMMC status. Guide: CMMC flow-down to subcontractors (DFARS 252.204-7021).
- Where the answer comes from
- The supplier, with the date the score was posted to SPRS: through the portal, a document it sends, or a score you record yourself.
3. CUI handling and CMMC status signed
Warning · From the supplier- What counts
- The supplier signed the "CUI handling and CMMC status" questionnaire through the portal in the last year.
- Why it is on the list
- The supplier states its CMMC status as it shows in SPRS (level, assessment type, final or conditional, status date and the latest affirmation) and its SPRS score, and signs it. The template cites DFARS 252.204-7012 and -7021. Guide: CMMC flow-down to subcontractors (DFARS 252.204-7021).
- Where the answer comes from
- The supplier, signed through the portal. The item asks for a signature from the last year.
What the supplier is asked
The supplier answers through its portal and signs. These are the questions as it sees them; some appear only after an earlier answer.
CUI handling and CMMC status
For subcontracts that involve federal contract information or controlled unclassified information (DFARS 252.204-7012 and -7021, and the NIST SP 800-171 assessment clause in your customer's contract). Answer as the company's CMMC status shows in SPRS, and attach the certificate and the latest affirmation if your customer asked for them.
- Will the company process, store or transmit CUI under this subcontract?
- Current CMMC level
- How was that level assessed?
- Is the status final or conditional?
- CMMC status date (the date of the assessment, or of the POA&M closeout)
- POA&M closeout due date, if not 180 days after the status date
- Expiry date on the certificate (leave blank to count from the status date)
- CMMC Unique Identifier (UID) from SPRS
- Certifying C3PAO
- Date of the latest affirmation in SPRS
- Affirming official (name and title)
- Most recent SPRS (NIST SP 800-171) score
- Date that score was posted to SPRS
- Are there open POA&M items?
What the signature says: I am authorized to answer for the company. These answers match what the company has posted in SPRS and holds from its assessor, and I will tell the customer promptly if any of them changes.
What stays with you
- The assessment itself
- Watch doesn't assess anyone and isn't a CUI system: it keeps the status your subs give you next to their public record. Don't upload CUI to it. See the CMMC flow-down guide.
- Your contract
- Which checks an award needs depends on the prime contract, the subcontract's value and what the sub will touch. Treat this as the list to start from and read the clauses in your own contract. See which checks depend on the award.
Holding suppliers to it in Watch
Start a requirement set from the "CMMC Level 2 (Self)" template and edit any item. Then:
- Attach the set to a list, to a tag (such as one contract number), or to a single supplier.
- The matrix shows every supplier it covers against every item: met, unmet, needs review, or expiring.
- Each unmet item raises a "Requirement not met" finding on that supplier, and clears itself when the evidence arrives.
- Send a portal request from a supplier's page and Watch fills it with exactly the items that supplier is missing.
Try it on your own suppliers
14-day trial, no card. Up to 25 suppliers. Paste UEIs, upload a list or type one sentence, then start a requirement set from this template.
Questions
What does the "CMMC Level 2 (Self)" checklist ask of a supplier?
Does the prime have to flow CMMC down to subcontractors?
Is CMMC Phase 2 still starting November 10, 2026?
Does Watch assess CMMC?
Often used with
- DoD subcontract with CUI: what to collect from the subcontractor
- Federal subcontractor eligibility checklist