CMMC Level 1 (Self): what to collect from a subcontractor

The CMMC part on its own, for a sub that handles federal contract information and no CUI: a current Level 1 self-assessment status and a signed questionnaire. It says nothing about registration or exclusions, so use it alongside an eligibility checklist.

The list is the "CMMC Level 1 (Self)" requirement template as Watch ships it, read on November 15, 2026. General information, not legal advice.

What the template covers

FCI only: a Level 1 self-assessment every year with every requirement met (no POA&M at Level 1), affirmed in SPRS by the affirming official (32 CFR 170.15).

2 items, all answered by the supplier. Each is marked critical or warning, which is the severity of the finding an unmet item raises in Watch.

The checklist

  1. 1. CMMC Level 1 (Self) or higher

    Critical · From the supplier
    What counts
    A current CMMC status at Level 1 (Self) or higher: inside its validity, a conditional status inside its 180 days, affirmed in the last year.
    Why it is on the list
    Paragraph (f) of DFARS 252.204-7021 has the prime, before awarding a subcontract that will process, store or transmit FCI or CUI, make sure the sub has a current CMMC certificate or status at the level appropriate for the information flowed down to it. The template cites 32 CFR 170.15. Guide: CMMC flow-down to subcontractors (DFARS 252.204-7021).
    Where the answer comes from
    The supplier: an attestation through the portal, a document it sends, or a status you record yourself. Watch doesn't assess anyone.
  2. 2. CUI handling and CMMC status signed

    Warning · From the supplier
    What counts
    The supplier signed the "CUI handling and CMMC status" questionnaire through the portal in the last year.
    Why it is on the list
    The supplier states its CMMC status as it shows in SPRS (level, assessment type, final or conditional, status date and the latest affirmation) and its SPRS score, and signs it. The template cites DFARS 252.204-7012 and -7021. Guide: CMMC flow-down to subcontractors (DFARS 252.204-7021).
    Where the answer comes from
    The supplier, signed through the portal. The item asks for a signature from the last year.

What the supplier is asked

The supplier answers through its portal and signs. These are the questions as it sees them; some appear only after an earlier answer.

CUI handling and CMMC status

For subcontracts that involve federal contract information or controlled unclassified information (DFARS 252.204-7012 and -7021, and the NIST SP 800-171 assessment clause in your customer's contract). Answer as the company's CMMC status shows in SPRS, and attach the certificate and the latest affirmation if your customer asked for them.

  1. Will the company process, store or transmit CUI under this subcontract?
  2. Current CMMC level
  3. How was that level assessed?
  4. Is the status final or conditional?
  5. CMMC status date (the date of the assessment, or of the POA&M closeout)
  6. POA&M closeout due date, if not 180 days after the status date
  7. Expiry date on the certificate (leave blank to count from the status date)
  8. CMMC Unique Identifier (UID) from SPRS
  9. Certifying C3PAO
  10. Date of the latest affirmation in SPRS
  11. Affirming official (name and title)
  12. Most recent SPRS (NIST SP 800-171) score
  13. Date that score was posted to SPRS
  14. Are there open POA&M items?

What the signature says: I am authorized to answer for the company. These answers match what the company has posted in SPRS and holds from its assessor, and I will tell the customer promptly if any of them changes.

What stays with you

The assessment itself
Watch doesn't assess anyone and isn't a CUI system: it keeps the status your subs give you next to their public record. Don't upload CUI to it. See the CMMC flow-down guide.
Your contract
Which checks an award needs depends on the prime contract, the subcontract's value and what the sub will touch. Treat this as the list to start from and read the clauses in your own contract. See which checks depend on the award.

Holding suppliers to it in Watch

Start a requirement set from the "CMMC Level 1 (Self)" template and edit any item. Then:

  • Attach the set to a list, to a tag (such as one contract number), or to a single supplier.
  • The matrix shows every supplier it covers against every item: met, unmet, needs review, or expiring.
  • Each unmet item raises a "Requirement not met" finding on that supplier, and clears itself when the evidence arrives.
  • Send a portal request from a supplier's page and Watch fills it with exactly the items that supplier is missing.

Try it on your own suppliers

14-day trial, no card. Up to 25 suppliers. Paste UEIs, upload a list or type one sentence, then start a requirement set from this template.

Questions

What does the "CMMC Level 1 (Self)" checklist ask of a supplier?
2 items: CMMC Level 1 (Self) or higher; and CUI handling and CMMC status signed.
Does the prime have to flow CMMC down to subcontractors?
Yes, where the subcontract will involve processing, storing or transmitting FCI or CUI (COTS items excluded). Before awarding it, the prime makes sure the sub has a current CMMC certificate or status at the level appropriate for the information flowed down. Read the clause in your contract for the exact terms. From the guide CMMC flow-down to subcontractors (DFARS 252.204-7021), checked October 22, 2026.
When did the CMMC contract clause take effect?
The DFARS rule adding 252.204-7021 was published September 10, 2025 and took effect November 10, 2025, starting Phase 1 (self-assessments). From the guide CMMC flow-down to subcontractors (DFARS 252.204-7021), checked October 22, 2026.
Does Watch assess CMMC?
No. Watch keeps the certificate and SPRS score your subs give you, with dates and expiry warnings, next to their SAM.gov status. It isn't a CUI system. From the guide CMMC flow-down to subcontractors (DFARS 252.204-7021), checked October 22, 2026.